Done photo. 5 months start to finish car.

This is the place to discuss restoration problems, post questions or projects-complete or partial.
paintdudeluke

Done photo. 5 months start to finish car.

Post by paintdudeluke »

10 weeks ago I bought my first Fiat. 81 2000.
It was parked in the garage almost 10 years ago and sat there ever since. Purchase = $800-

I'm updating this list as I complete it.

STARTING CONDITION:
1]Tank full of turpentine
2]brakes frozen on rotors
3]no battery
4]wiring strung allover hell
5]dry rotted flat tires
6]wouldn't start when it was last driven
7]exhaust system rotted
8]thrashed top
9]no horn
10] tired looking console/floor/carpets etc.
-------------------------------------------------------------------------------------
10 week update:
1]new tires
2]new battery
3]wiring fixed/eliminated/repaired
4]full ignition tuneup
5]tank dropped and flushed
6]new fuel filter
7]bumpers removed/new front blinkers added
8]interior streamlined or replaced
9]new oil/temp gauges
10]free flow air filter
11]new complete exhaust
12]caliper rebuild, pads, drilled rotors,hoses.
13]new horns
14] 3/14 wheels and tires done.
15] new front glass...3/22
16] new top...3/22
17] dyed interior black
18] paint 4/26


Grand total= $3000
--------------------------------------------------------------------------
Last edited by paintdudeluke on Mon Apr 28, 2014 10:08 am, edited 10 times in total.
Sambo42
Posts: 155
Joined: Fri Apr 09, 2010 12:00 am
Your car is a: 1971 Fiat Spider

Re: 10 weeks into it, really moving along.

Post by Sambo42 »

That sounds fantastic! Keep up the good work

- and we need PICS!
FiatJB

Re: 10 weeks into it, really moving along.

Post by FiatJB »

Why a roll bar?
paintdudeluke

Re: 10 weeks into it, really moving along.

Post by paintdudeluke »

8)
Last edited by paintdudeluke on Mon Apr 28, 2014 10:09 am, edited 1 time in total.
paintdudeluke

Re: 10 weeks into it, really moving along.

Post by paintdudeluke »

Just put a new windshield in and a new top on it today. Total 3.5 hrs. The glass is the easiest thing ever and the top was no more difficult than putting on a wrangler top except you glue a few spots and pop in a couple rivets. Total piece of cake. 2 people a must for sake of simplicity, but these are jobs not to be scared of. New glass and a black top that actually keeps the rain out is awesome! :D :D
spider2081
Patron 2024
Patron 2024
Posts: 3015
Joined: Fri Jan 27, 2006 11:45 pm
Your car is a: 1981 Spider 2000
Location: Wallingford,CT

Re: 10 weeks into it, really moving along.

Post by spider2081 »

Sometimes reading the posts here one would think our cars are the most difficult to work on.

It's great to read posts from someone who appreciates these Fiats and realizes for the word "FUN" to be found in the word "WORK" is my choice.

Thanks for the positive outlook and posts.
georgeramos
Posts: 1359
Joined: Wed Nov 02, 2011 11:11 am
Your car is a: 1971 124 Spider 1608

Re: 10 weeks into it, really moving along.

Post by georgeramos »

I think it's a pretty common perception around here that these cars are very easy to work on. Sometimes rookies like me may sound like we're in real trouble but things usually work out well in the end.
paintdudeluke

Re: 10 weeks into it, really moving along.

Post by paintdudeluke »

Almost 4 months and a 3-day weekend away from paint. (I don't get why I have to right click and open in a new tab to see the image...)

Image


Image
Last edited by paintdudeluke on Sat Apr 12, 2014 8:48 am, edited 1 time in total.
paintdudeluke

Re: 16 weeks into it..update pics

Post by paintdudeluke »

This was when I brought it home in December.


Image
User avatar
azruss
Posts: 3659
Joined: Sun May 30, 2010 12:24 pm
Your car is a: 80 Fiat 2000 FI

Re: 16 weeks into it..update pics

Post by azruss »

that tab feature is very cool. didnt know you could do that. for the picture to display right, the size needs to be 700 pixels wide.
paintdudeluke

Re: 16 weeks into it..update pics

Post by paintdudeluke »

Started paint work. Hood & trunk done and cowl. The rest of the red later this week. (right click, open in new tab to view)

Image
paintdudeluke

Re: 16 weeks into it..update pics

Post by paintdudeluke »

Painted and pretty much done. 5 months and ~3k total. Really gets a stupid amount of attention. Cool stuff. (right click open in new tab to see)

Image
Jimb
Posts: 740
Joined: Mon May 05, 2008 1:03 am
Your car is a: 1985.5 Volumex

Re: Done photo. 5 months start to finish car.

Post by Jimb »

Looks good
User avatar
RRoller123
Patron 2020
Patron 2020
Posts: 8179
Joined: Sun Nov 13, 2011 2:04 pm
Your car is a: 1980 FI SPIDER 2000
Location: SAGAMORE BEACH, MA USA

Re: Done photo. 5 months start to finish car.

Post by RRoller123 »

Looks great! I like the offsetting black hood. If you are so inclined, you can slightly lower the 2 front hood hinges to bring the top grille chrome trim into alignment. Loosen the bolts and reposition the hinge base downwards.
'80 FI Spider 2000
'74 and '79 X1/9 (past)
'75 BMW R75/6
2011 Chevy Malibu (daily driver)
2010 Chevy Silverado 2500HD Ext Cab 4WD/STD BED
2002 Edgewater 175CC 80HP 4-Stroke Yamaha
2003 Jaguar XK8
2003 Jaguar XKR
2021 Jayco 22RB
2019 Bianchi Torino Bicycle
paintdudeluke

Re: Done photo. 5 months start to finish car.

Post by paintdudeluke »

Image
Post Reply